PROJECT DIARY
PROJECT DETAILS
Project Name
Development of 10 Flats on 3 Floors
Adresss
3 Remi Adekoye Avenue
Approval number
LSC12345
Supervisor
Arc. Toye Ogunbiyi
Officer
Eng. Niyi Eleme
Start Dare
1 January 2018
End Dare
Ongoing
Contraventions
Active Stop Work Order
APPROVAL ORDER
Land Use Class
Residential
Development Density
Max 30Units / Hectare.
Set Backs
9m to Front; 5m to Sides; 5m to Rear. 6m In-Between 2 Buildings
Set Back to Public Utilities
Road: 24m Right of Way: 12m Set Back from Center of Road to Property Line
Electric Line – 11kV: 6m
Building Coverage
Maximum 50% Building Footprint
Minimum 10% Soft Landscaping
Car Parking
20nos Car Parking Spaces
ON-SITE TEAM
Contractor
Precision Builders
Architect
Design Facility
Structural Engineer
Props Nig Ltd
M&E Engineer
Pipes & Circuits Nigeria Ltd
Quantity Surveyor
Billd Nig Ltd
Project Manager
Timelines Nig Ltd
SITE ENFORCEMENT ACTION: 22.07.19
Stop work order issued! Building control were not invited for inspection prior to casting the slab.
SITE VISIT REPORT: 16.05.19
Reinforcement placed on grid lines 4-8 and contractor advised to invite officials for inspection of casting – giving no less than 24 hours notice prior.
SITE VISIT REPORT: 04.04.19
Form work placed in preparation of reinforcement placement which has commenced in areas.
SITE VISIT REPORT: 06.03.19
Works ongoing and form work placement carries on. Bowing observed in certain areas where defective boards were used.
SITE VISIT REPORT: 14.02.19
De-propping of suspended slab ongoing. Props left in key structural locations as advised in method statement.