PROJECT DETAILS

PROJECT NAME:

DEVELOPMENT OF 2NOS SEMI-DETACHED UNITS IN ELEGUSHI.

ADDRESS:

32 PALACE ROAD ONIRU

APPROVAL NUMBER:

LSC645247

SUPERVISOR:

ARC DEJI ALADE

OFFICER:

ENG ISAAC RUBIN

START DATE:

01.01.2016

END DATE:

ONGOING

CONTRAVENTIONS:

NONE

 

CHECK LIST

PROJECT DIARY

APPROVAL ORDER

LAND USE CLASS

RESIDENTIAL

DEVELOPMENT DENSITY

Max 30Units / Hectare.

SET BACKS

9M TO FRONT; 5M TO SIDES; 5M TO REAR. 6M IN-BETWEEN 2 BUILDINGS

SET BACKS TO PUBLIC UTILITIES

ROAD: 24M RIGHT OF WAY: 12M SET BACK FROM CENTER OF ROAD TO PROPERTY LINE

ELECTRIC LINE – 11KV: 6M

BUILDING COVERAGE

MAXIMUM 50% BUILDING FOOTPRINT

MINIMUM 10% SOFT LANDSCAPING

CAR PARKING

20NOS CAR PARKING SPACES

ON-SITE TEAM

CONTRACTOR:

LABACOD

ARCHITECT:

FRENCH CURVE

STRUCTURAL ENGINEER:

REBAR

M&E ENGINEER:

SOBAC NIG LTD

QUANTITY SURVEYOR:

BENYLYN GROUP

PROJECT MANAGER:

PRO-DUCTS

 

APPROVAL DOCUMENTS

ARCHITECTURAL DRAWINGS

STRUCTURAL DRAWINGS

ELECTRICAL DRAWINGS

MECHANICAL DRAWINGS

SUPPORT INFORMATION

Tweet
Share
Share